ROAD CLOSURES CONTINUE FOR N.M. 189, BOYER ROAD

ROAD CLOSURES CONTINUE FOR N.M. 189, BOYER ROAD

Road construction will keep N.M. 189 closed through December 5, a spokesperson from Burn Construction Co., Inc., said.

The road is closed from N.M. 478 to the Rio Grande Bridge. Traffic has been detoured through N.M. 192 (Mesquite) or through N.M. 226 (Berino).

Boyer Road will be closed from N.M. 478 to Lechuga Drive next Monday through Friday. Local traffic will be detoured.

Construction will begin along the Mesquite Drain starting at NM 227 heading north. Drain Levee Road will be closed. Local residents must access their properties from Highline Road.

For more information, call Rachel Bustos, of Burn Construction, at (505) 526-4421.